Download Case Studies

I have a wide range of case studies that are all freely available to download . Simply register and click here.
Home arrow What I Offer arrow Design Portfolio arrow Case Studies arrow Miscellaneous Designs
Miscellaneous Designs  E-mail
Apart from featured designs illustrated elsewhere, there were a number of design commissions completed in New Zealand that were never built. Sometimes this was because the work was speculative - the client wanted to see what his or her dreams might cost and was willing to invest btime anmd money to finf out. In other instances, slient circumstances changed, and projects were abandooned, sometimes even at late stages, after the acquisition of permits and approvals. Below are brief descriptions of some of these projects.
 

 The Barrance Houses

 

Image
Entrance
Click image to enlarge
 
 
Image
Garden/Deck
Click image to enlarge

 

 Image

Entry/Mezzanine Floor Plan

To enlarge click image

 

Image  

Lower Floor Plan

To enlarge click image

 

In 1985,  Phillip Barrance was a young builder who bought s steep and very wooded section in Freemand Bay, in exclusine inner city Auckland. Phillip wanter to build three townhouses onn the bottom portion of the section, and to sell them. He wanted houses that were essentially private, but with an internal feeling of spaciousness, all within a tight budget. He wanted an expression that connoted "South pacific" with overtones of maori and Polynesian influence. The resulting design is on four levels, stepping down the site and wrapping around a private garden. The lower level comprises the bedroom areas. The top level is a study high in the trees. In between are mezzanine levels with lkiving and dining areas. The entrance is at the third level which also houses a guest (3rd) bedroom.

 

The houses were to be finished in cedar ply with applied battens. Sadlky, they were never built. The client was unable to raise the necessary capital and instead built two, prefabricated units.

 


Aumonier-Ward House

This was my family home when we first moved to New Zealand. A double-fronted villa located adjacent to Gribblehurst Park in Sandringham. Earlier owners hadenclosed the verandah, losing much of the modelling that such buildings possess. Shortly after our arrival myfather came from the U.K. to live with us, and it was inportant to quickly provide additionsl separate and private accommodation for him as well as more space for the family. Both my wife Claire and I needed our own home offices and our son Jonathan was being home-schooled and needed extensive space of his own. We decided on an extensive remodel, exploiting the flamboyance of the original villa and expressing our exuberance at being in New Zealand. The future looked bright.

 

Image   Image

Aumonier-Ward House

 

The accommodation for my father was the easiest part of the project. An old but sound outbuilding, the size of a large garage, stood in the back garden. I converted this into a self-contained flat for my day, complete with separate bathroom and small kitchenette. The grounds were extensively planned with wgarden water features and extensive vegetable gardens.Care was taken to make maximum use of the natural sunlight - opening up the walls with added bays to capture the top-light.

Image

Site Plan 

 

These bays catch the morning sunlight -something villas are not noted for. The division between the main bedroom and the living areawas to be demolished - offering a much more extensive family area off the farmhouse kitchen. The master bedroom is then added at a second floor level and accessed from a new stair off the living space.

 

Image

Ground Floor Plan

 

The First floor, contains the new Master Bedroom and en suite  as well as a room for our son, Jonathan. The plan is cruciform, echoing the symmetry of the villa itself.

Image

First Floor Plan

I completed work on the studio apartment for my father by 1986 and embarked upon the construction of the modification at the end of that year. I was doing all of the construction work myself as well as maintaining a full-time job at the University of Auckland. To keep costs down I used recycled materials, obtained from the numerous demolition yards around the city (where I spent many Saturdays). We took out a second mortgage to fund the construction and then, in 1987, the Market crashed. Our first mortgage interest rate increased to 19.5% and our second mortgage to 21.5%. I began doing consulting design work (on top of the University job and the construction) to pay the bills. It was a hopeless task that took its emotional toll on the family. Late in 1987, Claire and I separated, leaving the work incomplete. I finished the work that needed to be done to make the house livable and moved out.

 





Digg!Reddit!Del.icio.us!Google!Facebook!Slashdot!Netscape!Technorati!StumbleUpon!Squidoo!Free social bookmarking plugins and extensions for Joomla! websites!
 
womens-center-sf-copy.jpg

Login Form

All of the material on this site is absolutely free. All that we require is that you first register (below) and then login to view content.





Lost Password?
No account yet? Register

RSS Feeds

Simply click one of the options below to access an RSS Feed for this site.